Road construction and asphalt paving
End-to-end road construction from route preparation to commissioning: earthworks, base courses, drainage, asphalt concrete paving, shoulders, markings, and site finishing.
Licensed construction company
Atlas Construction delivers road and general construction projects throughout Kyrgyzstan. We organize production, manage resources, and take responsibility for the quality of the final result.
Atlas Construction LLC was registered on 18 February 2026. The company holds valid licence No. 13423, issued on 20 August 2026, to perform construction and installation works.
The company specializes in road and transport infrastructure as well as building construction. All work follows approved design documentation, required methods and schedules, with quality controlled at every stage.
Seven specialized disciplines are united by consistent standards for preparation, work organization, and quality of execution.
End-to-end road construction from route preparation to commissioning: earthworks, base courses, drainage, asphalt concrete paving, shoulders, markings, and site finishing.
Construction of piers, spans, approaches, and transition sections in accordance with design solutions, method sequences, and safety requirements.
Construction of residential, commercial, and industrial buildings, including structural frames, engineering systems, finishes, and preparation for handover.
Water supply, sewerage, heating, ventilation, drainage, and stormwater systems coordinated across all design disciplines.
Cast-in-place and precast elements, foundations, frames, floor slabs, and brick or block masonry for structural parts of buildings.
Fabrication and installation of columns, beams, trusses, bracing, and spatial frames for buildings and engineering structures.
Additional service
The company supplies BND 60/90 petroleum paving bitumen throughout the Kyrgyz Republic. Delivery uses dedicated bitumen tankers that maintain the required temperature through to the destination. We agree volumes, dispatch schedules, and routes, then coordinate delivery to an asphalt plant or the client’s site.
Rail logistics
For large and recurring consignments, we arrange transport of BND 60/90 paving bitumen in dedicated rail tank cars. We coordinate the route, origin and destination stations, train scheduling, and shipping documents. Where required, we also arrange onward delivery from the station to the receiving point.
Discuss rail deliverySupply coordination
We align supply with the client’s production schedule and coordinate every stage.
We confirm the BND 60/90 grade, required volume, destination, and delivery dates.
We arrange road or rail transport based on volume, route, and delivery schedule.
We coordinate consignment arrival, handover of accompanying documents, and client acceptance.
Construction management
We compare the documentation with actual site conditions, verify quantities, and identify technical risks before work begins.
We define the method sequence, schedule, equipment fleet, material requirements, and specialist resources.
We coordinate all participants, maintain workable fronts, and monitor compliance with design and method requirements.
We verify completed quantities, document each stage, and hand over the completed asset with the required records.
Select a discipline to view the method sequence from site preparation through completion.
Preparation
Verification of baseline data, surveying and setting out, site clearance, and organization of the work zone.
Earthworks
Excavation and movement of soil, formation profiling, layer-by-layer compaction, and installation of drainage elements.
Pavement structure
Placement of specified materials, profiling, moisture conditioning, and compaction of every structural layer.
Surfacing
Application of binder, paving and compaction, construction of tie-ins, road markings, and final site works.
Preparation
Site organization, survey control, excavation preparation, and construction of foundations to the design.
Substructure
Reinforcement, concreting, and installation of substructure elements with geometry and strength control.
Superstructure
Installation of girders or trusses, construction of the deck slab, waterproofing, and protective layers.
Transitions
Construction of transition zones, drainage, expansion joints, barriers, and completion of specified inspections.
Substructure phase
Setting out, earthworks, bases, foundations, and underground sections of engineering utilities.
Structure
Construction of the structural frame, floor slabs, walls, partitions, and roofing system in accordance with the design.
Building services
Installation of water, sewerage, heating, ventilation, and other specified building services.
Completion
Completion of finishes, system testing, close-out of observations, and preparation of as-built documentation.
Every project is led by specialists accountable for their discipline and aligned on the overall result. Roles, decisions, and control points are assigned before work begins.
Project team
The team is tailored to the scale, methods, and conditions of each project.We verify baseline data, design solutions, quantities, and site conditions before mobilizing resources.
We align the schedule, equipment, materials, and budget so every decision is backed by real resources.
Key decisions are considered, execution is controlled, and commitments to the client remain measurable.
Leadership and personal accountability
Kubanychbek Zhabiev is the founder and CEO of Atlas Construction. More than 20 years of banking and management experience have shaped a systematic approach to calculations, risk, and the fulfilment of commitments.
07 / Our mission
To build roads and assets that reliably serve people and businesses.Built to the design. Delivered to the required method.
Tell us about the project, including the asset type, location, expected scope, and preferred schedule. We will contact you, clarify the baseline information, and discuss the next steps.